top of page

Workin' it

  • Yvettephilips
  • Jul 10, 2014
  • 1 min read

?xml version="1.0" encoding="UTF-8" standalone="no"?

Ultimo Constructions at work on Rose Bay Vet.

We've successfully joined the existing veterinary practice and the adjacent shop, laid a new floor substrate and have the air con crew setting up a new system to keep the consult rooms and reception area at separate optimum temperatures.

 
 
 

Comments


Featured Posts

Blog archive

Search By Tags

bottom of page